Post by account_disabled on Mar 4, 2024 1:27:12 GMT -5
that nine days ago left 114 dead and 70 missing, reported yesterday that the level of sodium cyanide detected within the area of the tragedy exceeds 356 times what was considered. admissible, after four days ago he assured that the concentration of this chemical was 28 times higher than what was tolerable. According to the agency, this highly toxic substance was detected in eight of the 25 control points placed within the most dangerous area, which occupies about 100 thousand square meters. Control Cyanide was also detected at six of 16 other checkpoints located outside the most dangerous area. However, in none of them the concentration of this substance exceeded normal levels. The Environment Office insisted that the cyanide is contained in the exclusion area, around which a protective earthen wall has been erected to prevent dangerous substances from leaking. The Tianjin authorities recognize the presence of 700 tons of this product, which is used in the production of gold and can be fatal if ingested or inhaled, in the containers of the warehouse where the explosion occurred, owned by the company Ruihai International Logistics.
The Internal Control Body of the Mexico City Airport Group (GACM) investigates whether the deputy director of Projects, Próspero Rigoberto Antonio Ortega Moreno, incurred a conflict of interest. This official is the father of Próspero Antonio Ortega Castro, who serves as corporate director of Administration at Empresas ICA, a group that has won at least one contract from the New Mexico City International Airport (NAICM) and that is actively Argentina Mobile Number List participating in other tenders. . The investigation began with a complaint that reached the Complaints Area of the Internal Control Body (OIC) of the GACM on which detailed the alleged irregularities. One of them is that Ortega Moreno's signature appears in the failure report of the tender dated March 4, 2015, where ICA won a contract for 9.4 million pesos to build the access roads. to the NAICM construction site. The same day that the complaint reached him, Marco Antonio Moreno Bazán, head of the Complaints Area of the OIC, requested information from the Corporate Directorate of Real Estate Administration and Management of the same group. I request that within a period of no more than ten business days from the receipt of this letter, you send to this Complaints Area a report of each of the facts referred to in the complaint received and provide the originals of the Record of Failure of the Public Tender No.
As well as the contract that has beenSigned as a result of said failure, and the Constitutive Minutes of the company Ingenieros Civiles Asociados, SA de CV, which has been presented by participating in said tender," states official letter 09/448/TQR- 733/2015, of which Grupo REFORMA has a copy. This letter cites a part of the original complaint, in which fear is expressed that, thanks to the relationship of these two characters, ICA had obtained advantageous information over others in two tenders that are underway: LO-009KDH999-N47- 2015, to build the construction site, and LO-009KDH999-N50-2015, for storm drainage. "(...) it is logical to assume the transmission of privileged information, both in terms of its content and timing, putting the aforementioned company at an unfair advantage over the rest of the contenders," the document indicates. The decision of the competition corresponding to the construction of the camp has been postponed twice and the winner is expected to be known today. ICA has the fifth lowest proposal among 17 interested bidders. Grupo REFORMA consulted the GACM OIC, but said it could not respond because it is in the investigation process. However, GACM sources assured that Ortega Moreno resigned to avoid "suspicions" of favoritism with ICA. They assured that the resignation was effective on May 31. In the GACM Transparency Obligations Portal, this official was still active until June 26, 2015, with monthly gross receipts amounting pesos.